Skip to main content

3 Car Garage - Dohney Flakes - New Palestine, IN

Dohney flake new palestine

Client wanted all control joints filled, fixed pitted & spaulding on concrete slab, diamond grind to remove existing coating 1st, then coated step to match new floor, driveway lip & around water heater, furnace, ect. Used the WAUGH 7 step process 100% satisfied customer. We also applied base color on driveway approach apron, to give client a complete finished look when garage door is closed on inside of garage. Complete with 15 Year Manufacture Warranty.

  1. Remove old ugly failing epoxy floor coating.
  2. Diamond grind and vacuum. Repair cracks.
  3. Apply self-priming polyaspartic base coat.
  4. Full broadcast flake providing even color and texture.
  5. Scrape excess flake off and vacuum.
  6. Do final preparations for sealing.
  7. Apply UV stable polyaspartic topcoat.

Products Used

FloorShield State of Art 100% Solids Polyaspartic Concrete Coating System

REQUEST A FREE QUOTE TODAY FOR YOUR NEXT INDIANAPOLIS FLOOR COATING & PRESSURE WASHING PROJECT!