Skip to main content

3 Car Garage, Filled Control Joints, Finished Steps in New Palestine, IN

IMG

Large 3 car garage. Filled in control joints for customer, fix & repair pitting & spaulding, Diamond grind garage floor including partially painted garage floor, Coated steps, around water softener, HVAC system, also applied base coat (only)on driveway approach apron. making this project really stand out with that Old School Mustang. 15 Year Manufacture Warranty.

  1. Remove old ugly failing epoxy floor coating.
  2. Diamond grind and vacuum. Repair cracks.
  3. Apply self-priming polyaspartic base coat.
  4. Full broadcast flake providing even color and texture.
  5. Scrape excess flake off and vacuum.
  6. Do final preparations for sealing.
  7. Apply UV stable polyaspartic topcoat.

Products Used

FloorShield State of Art 100% Solids Polyaspartic Concrete Coating System

REQUEST A FREE QUOTE TODAY FOR YOUR NEXT INDIANAPOLIS FLOOR COATING & PRESSURE WASHING PROJECT!